Jefferson Patterson Park & Museum Phase 4

Created by Scott Hardaway on Jan 08, 2015  
;

General
Construction Dates: 
Estimated
1999
St. Leonard , MD
United States
38° 23' 42.2556" N, 76° 30' 42.4152" W
Maryland US
Pre-Project Conditions
Major Plant Species Present: 
None
Submerged Aquatic Vegetation (SAVs) present?: 
No
Bank elevation above MHW: 
25.0 feet
Pre-Construction Erosion Present?: 
Yes
Pre-Construction Erosion at Adjacent Parcels?: 
Yes
Environmental Considerations
Name of Waterbody: 
Patuxent River
Site Classification: 
Straight
Shoreline orientation relative to max. fetch distance: 
0 Degrees
Tidal Range: 
1.2 feet
Adjacent to Navigation Channel?: 
No
Salinity: 
Brackish: 0.5 – 30 ppt
100-year Flood Elevation Seaward of the Shoreline: 
6.1 feet
100-Year Flood Elevation Vertical Datum: 
Other
Other Vertical Datum: 
MLW
Design Considerations
Was fill brought in?: 
Yes
Type of Fill: 
Sand
Length of Project: 
2,500 feet
Design Criteria: 
Storm Return Period
Design Wave Height: 
4.7 feet
Structural Elements
Drop downs, or openings or overlaps?: 
Yes
Project Performance
Overall performance of Living Shoreline for erosion protection?: 
High
Storm Exposure: 
Yes
Storm Date: 
Thursday, September 18, 2003
Storm Intensity: 
High
Additional Information