Alabama Port Breakwaters

Created by Beau Buhring on Jan 07, 2015  
;

General
Mobile , AL
United States
30° 20' 52.2384" N, 88° 7' 18.6132" W
Alabama US
Pre-Project Conditions
Submerged Aquatic Vegetation (SAVs) present?: 
No
Pre-Construction Erosion Present?: 
Yes
Pre-Construction Erosion at Adjacent Parcels?: 
Do Not Know
Existing Structures or Debris?: 
No
Environmental Considerations
Name of Waterbody: 
Mobile Bay
Site Classification: 
Cove
Maximum Exposed Fetch Distance: 
22.00 miles
Shoreline orientation relative to max. fetch distance: 
15 Degrees
Tidal Range: 
1.2 feet
Adjacent to Navigation Channel?: 
Yes
Boat wake exposure: 
High
Project Site Within a Designated No-Wake Zone?: 
No
Description of Nearby Structures: 
Rubble or riprap bulkheads to the north and south
Design Considerations
Was fill brought in?: 
No
Length of Project: 
3,200 feet
Structural Elements
Did the project involve a structure?: 
Yes
Type of Structure: 
breakwater
Describe construction materials: 
Bagged oyster shells and proprietary concrete materials ("ReefBlks", "ReefBalls").
Length of Structure: 
2,430 feet
Area of shallow bottom conversion to structure: 
61,750 square feet
Width of Open Water Between Structure and Wetlands: 
100 feet
Height of Structure Above MHW: 
0.0 feet
Maximum depth at seaward edge of structure: 
3.2 feet
Maximum depth at landward edge of structure (including fill): 
3.2 feet
Drop downs, or openings or overlaps?: 
Yes
Width of drop downs or openings: 
30.0 feet
Was geotextile used in foundation?: 
I Dont Know
Non-Structural Elements
Percentage of vegetative cover between structure and MHW line: 
0%
Additional expected ecological benefits from project?: 
Oyster and fish habitat